Before implementing an ERP solution, it’s important to learn about the different phases of ERP implementation life cycle. Follow the link for OpenPro’s complete guide.

OpenPro is an established authority when it comes to ERP software solutions. If you’re wondering what a system development life cycle is, follow the link for OpenPro’s comprehensive guide.

First Web-Based ERP Solution
OpenPro since 1998 has developed a web-based ERP solution for business. Our fully integrated system includes Enterprise Resource Planning (ERP), Customer Relationship Management (CRM), Financials, Manufacturing, E-Commerce and the system manager includes document imaging, work flow, and knowledge base. OpenPro delivers more value and more features.

OpenPro is a leader in licensed Enterprise Resource Planning (ERP) software using open source technology.

OpenPro System Development Life Cycle

The Systems Development Life Cycle (SDLC) is a conceptual model used in project management that describes the stages involved in an information system development project from an initial feasibility study through maintenance of the completed application. Various SDLC methodologies have been developed to guide the processes involved including the waterfall model (the original SDLC method), rapid application development (RAD), joint application development (JAD), the fountain model and the spiral model. Mostly, several models are combined into some sort of hybrid methodology. Documentation is crucial regardless of the type of model chosen or devised for any application, and is usually done in parallel with the development process. Some methods work better for specific types of projects, but in the final analysis, the most important factor for the success of a project may be how closely particular plan was followed.

The image below is the classic Waterfall model methodology, which is the first SDLC method and it describes the various phases involved in development.

implem1
Briefly on different Phases:

Feasibility

The feasibility study is used to determine if the project should get the go-ahead. If the project is to proceed, the feasibility study will produce a project plan and budget estimates for the future stages of development.

Requirement Analysis and Design

Analysis gathers the requirements for the system. This stage includes a detailed study of the business needs of the organization. Options for changing the business process may be considered. Design focuses on high level design like, what programs are needed and how are they going to interact, low-level design (how the individual programs are going to work), interface design (what are the interfaces going to look like) and data design (what data will be required). During these phases, the software’s overall structure is defined. Analysis and Design are very crucial in the whole development cycle. Much care is taken during this phase. The logical system of the product is developed in this phase.

Implementation

In this phase the designs are translated into code. Computer programs are written using a conventional programming language or an application generator. Programming tools like Compilers, Interpreters, Debuggers are used to generate the code. Different high level programming languages like PHP, Java are used for coding. With respect to the type of application, the right programming language is chosen.

Testing

In this phase the system is tested. Normally programs are written as a series of individual modules, these subject to separate and detailed test. The system is then tested as a whole. The separate modules are brought together and tested as a complete system. The system is tested to ensure that interfaces between modules work (integration testing), the system works on the intended platform and with the expected volume of data (volume testing) and that the system does what the user requires (acceptance/beta testing).

Maintenance

Inevitably the system will need maintenance. Software will definitely undergo change once it is delivered to the customer. There are many reasons for the change. Change could happen because of some unexpected input values into the system. In addition, the changes in the system could directly affect the software operations. The software should be developed to accommodate changes that could happen during the post implementation period.